United States · Bill · HR
H.R. 6738 (97th)
A bill to amend the Public Utility Regulatory Policies Act of 1978 to provide for the consideration of construction work in progress, and for other purposes.
Introduced
13 July 1982
Last action
21 July 1982 · Referred
Status
Referred to Subcommittee on Energy Conservation and Power.
Sponsors
Rep. Collins, James M. [R-TX-3]
Subjects
Energy
Source updated
15 January 2025
Summary
Amends the Public Utility Regulatory Policies Act of 1978 to provide that the cost of construction work in progress shall be included in the rate base used to establish electric utility rates.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
13 July 1982
Introduced
Referred to House Committee on Energy and Commerce.
Source: IntroReferral
13 July 1982
Introduced
Introduced in House
Source: IntroReferral
13 July 1982
Introduced
Introduced in House
Source: IntroReferral
21 July 1982
Referred
Referred to Subcommittee on Energy Conservation and Power.
Source: Committee
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in House
summary · EN · 13 July 1982
Sponsors
- Rep. Collins, James M. [R-TX-3] · R · Sponsor
- · hsif00 · Standing
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/97th-congress/house-bill/6738
- Open data entity: https://api.congress.gov/v3/bill/97/hr/6738
- us · 97-hr-6738 · source updated 15 January 2025