PoliticalRepoPoliticalRepo

United States · Bill · S

S. 1142 (115th)

J. Bennett Johnston Waterway Hydropower Extension Act of 2018

openUnited States· United States Congress· EN

Introduced

16 May 2017

Last action

Status

Held at the desk.

Sponsors

Subjects

Discovery layer

Source updated

24 March 2026

Summary

J. Bennett Johnston Waterway Hydropower Extension Act of 2017 This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana. The licensee is not required to pay an annual charge for administrative expenses until construction commences. FERC may reinstate the construction license if it is expired.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

9 official files

Engrossed in Senate (text)

View fileDownload file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.