United States · Bill · S
S. 1175 (111th)
A bill to amend the Public Utility Regulatory Policies Act of 1978 to authorize the Secretary of Energy to make loans to electric utilities to carry out projects to comply with any Federal renewable electricity standard, and for other purposes.
Introduced
3 June 2009
Last action
—
Status
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to direct the Secretary of Energy to make loans to electric utilities to reduce their costs of complying with federal renewable energy standards and minimize the impact such standards have on consumers' electricity rates. Requires the use of such loans on projects that are approved by the Secretary, which may include the construction of renewable energy generation facilities or installation of energy efficiency or electricity demand reduction technology. Sets the interest rate on such loans, which may not exceed 30 years, at 0.5% more than the federal funds rate.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in Senate (text)
Introduced in Senate · EN · 3 June 2009
Introduced in Senate (PDF)
Introduced in Senate · EN · 3 June 2009
Introduced in Senate
summary · EN · 3 June 2009
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/111th-congress/senate-bill/1175
- Open data entity: https://api.congress.gov/v3/bill/111/s/1175