Environmentally Responsible Windpower Act of 2005
Introduced
9 June 2005
Last action
—
Status
Read twice and referred to the Committee on Energy and Natural Resources. (text of measure as introduced: CR S6301-6303)
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Environmentally Responsible Windpower Act of 2005 - States that a wind turbine project must complete its Local Notification Process as a prerequisite to Federal Energy Regulatory Commission (FERC) issuance of its Exempt-Wholesale Generator Status, Market-Based Rate Authority, or Qualified Facility rate schedule. Requires the lead agency to conduct and complete an environmental impact statement prior to FERC issuance of its Exempt-Wholesale Generator Status, Market-Based Rate Authority, or Qualified Facility rate schedule to a Qualified Wind Project in or near a Highly Scenic Area (or within 20 miles off the coast of a National Wildlife Refuge).
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in Senate (text)
Introduced in Senate (text)
Introduced in Senate · EN · 9 June 2005
Introduced in Senate (PDF)
Introduced in Senate · EN · 9 June 2005
Introduced in Senate
summary · EN · 9 June 2005
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/109th-congress/senate-bill/1208
- Open data entity: https://api.congress.gov/v3/bill/109/s/1208