United States · Bill · S
S. 1225 (99th)
Price-Anderson Act Amendments Act of 1985
Introduced
24 May 1985
Last action
10 September 1986 · Committee
Status
Committee on Energy and Natural Resources received executive comment from Justice Department.
Sponsors
Sen. Simpson, Alan K. [R-WY], Sen. McClure, James A. [R-ID]
Subjects
Energy
Source updated
24 March 2026
Summary
Price-Anderson Act Amendments Act of 1985 - Amends the Atomic Energy Act of 1954 to extend (from December 31, 1976, to 12 months after the date of enactment of this Act) the deadline by which the Nuclear Regulatory Commission (NRC) must prescribe the terms for licensees required to maintain financial protection to cover public liability claims. Increases: (1) from $2,000,000 to $10,000,000 the minimum standard deferred premium which may be charged following any nuclear incident: and (2) from $5,000,000 to $15,000,000 the maximum standard deferred premium which may be charged following such an incident for each facility required to maintain the maximum amount of financial protection. Directs the NRC to include in its determination of the maximum amount of liability insurance available to licensees from private sources the sum of funds generated by assessing a fee of up to one mil per kilowatt hour on electricty generated and sold by each licensed civilian nuclear power reactor. Authorizes the NRC to collect such fee from all civilian nuclear power reactor licensees, on all electricity generated and sold by such licensees following a nuclear incident, upon determining that public liability from such incident exceeds (or appears likely to exceed) the sum of the private insurance and the requisite industry retrospective rating plan. Sets $500,000,000 as the maximum that shall be collected per incident. Authorizes the NRC to establish a maximum amount which the aggregate fees assessed for each facility within one calendar year may not exceed. Authorizes the Secretary of Energy (the Secretary) to enter into indemnification agreements with contractors (until August 1, 2012) for the construction or operation of production or utilization facilities for the benefit of the United States involving activities under the risk of public liability for a substantial nuclear incident (currently, the NRC has this authorization). Includes in such authorization any contracts involving the storage or disposal of spent nuclear fuel, high-level radioactive waste, or transuranic waste, including the transportation of such materials to a storage or disposal site or facility, and the construction and operation of such site. Directs the Secretary to make available from the nuclear waste fund the amounts necessary to compensate public liability claims related to the transportation, storage or disposal of specified nuclear waste. Requires the Secretary: (1) to determine the extent to which a nuclear incident related to such waste involves materials produced as a result of electricity generated in a civilian nuclear power reactor (or materials resulting from other activities or both); and (2) to decide the appropriate source of funds to be used in compensating public liability claims based upon that determination. Requires the Secretary to promulgate the regulations for making such determination within 90 days of enactment of this Act. Authorizes the Secretary to require as part of an indemnification agreement that a contractor maintain financial protection to cover any public liability relating to the contractual activity. Sets indemnification guidelines for persons indemnified against public liability claims. Sets $100,000,000 as the maximum indemnification amount for nuclear incidents occurring outside the United States. Precludes a contractor with whom an indemnification agreement has been executed, and who is engaged in activities relating to underground detonation of a nuclear explosive device, from using any immunity or defense founded in the Federal, State or municipal character of the contractor or of the work performed. (This holds the contractor liable for damages resulting from such detonation to the same extent as a private person). Sets aggregate liability guidelines for nuclear incidents which involve: (1) licensees required to maintain the maximum amount of liability insurance; and (2) contractors with whom the Secretary has entered into indemnification agreements. Requires the Secretary and the NRC to report to the Congress the causes and extent of damage from any nuclear incident which will probably require payments by the United States. States that, upon a court determination that public liability from a single nuclear incident may exceed a certain aggregate liability, the President must report to the Congress regarding: (1) the causes and extent of damage: (2) the estimated compensation requirements; and (3) compensation plans. Requires congressional approval of compensation plans by passage of an approval resolution within 60 days after submission. Authorizes the NRC to incorporate provisions in indemnity agreements which waive certain defenses by contractors and licensees based upon fault, conduct, governmental or charitable immunity. Extends such waiver to extraordinary nuclear occurrences which result from: (1) transportation of nuclear or source material; or (2) activities undertaken by the Secretary, including the storage or disposal of nuclear waste (thus imposing a strict liability standard for any extraordinary nuclear occurrence). Extends from August 1, 1987, to August 1, 2012, the authority of the NRC to enter into indemnification agreements with contractors. Extends form August 1, 1983 to August 1, 2008, the deadline by which the NRC must submit to the Congress detailed reports concerning indemnification and liability procedures under the Act.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
24 May 1985
Referred
Referred to Subcommittee on Energy Research and Development.
Source: Committee
24 May 1985
Introduced
Read twice and referred jointly to the Committees on Environment and Public Works; Energy and Natural Resources by unanimous consent with the proviso that if either committee reports the bill, the other committee shall be obligated to report within 120 calendar days or be discharged from further consideration.
Source: IntroReferral
24 May 1985
Introduced
Introduced in Senate
Source: IntroReferral
25 June 1985
Committee
Subcommittee on Energy Research and Development. Hearings held. Hearings printed: S.Hrg. 99-439.
Source: Committee
11 July 1985
Committee
Committee on Energy and Natural Resources requested executive comment from Energy Department, OMB.
Source: Committee
22 October 1985
Committee
Subcommittee on Nuclear Regulation. Hearings held.
Source: Committee
23 October 1985
Committee
Subcommittee on Nuclear Regulation. Hearings held.
Source: Committee
26 February 1986
Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Source: Committee
6 March 1986
Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Source: Committee
26 March 1986
Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Source: Committee
27 March 1986
Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Source: Committee
16 April 1986
Committee
Committee on Energy and Natural Resources. Committee consideration and Mark Up Session held.
Source: Committee
23 April 1986
Reported
Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.
Source: Committee
24 April 1986
Referred
Referred to the Committee on Environment and Public Works, for a period not to exceed one hundred twenty calendar days, pursuant to the order of May 24, 1985.
Source: Floor
24 April 1986
Reported
Committee on Energy and Natural Resources. Reported to Senate by Senator McClure with an amendment in the nature of a substitute. Without written report.
Source: Committee
24 April 1986
Reported
Committee on Energy and Natural Resources. Reported to Senate by Senator McClure with an amendment in the nature of a substitute. Without written report.
Source: Committee
13 May 1986
Committee
Subcommittee on Nuclear Regulation. Hearings held.
Source: Committee
21 May 1986
Committee
By Senator McClure from Committee on Energy and Natural Resources filed written report. Report No. 99-310. Additional and minority views filed.
Source: Committee
21 May 1986
Floor
By Senator McClure from Committee on Energy and Natural Resources filed written report. Report No. 99-310. Additional and minority views filed.
Source: Floor
25 June 1986
Committee
Subcommittee on Nuclear Regulation. Approved for full committee consideration with an amendment favorably.
Source: Committee
6 August 1986
Committee
Committee on Environment and Public Works. Committee consideration and Mark Up Session held.
Source: Committee
7 August 1986
Reported
Committee on Environment and Public Works. Ordered to be reported with an amendment in the nature of a substitute favorably.
Source: Committee
15 August 1986
Calendars
Placed on Senate Legislative Calendar under General Orders. Calendar No. 859.
Source: Calendars
15 August 1986
Reported
Committee on Environment and Public Works. Reported to Senate by Senator Simpson with an amendment in the nature of a substitute. Without written report.
Source: Committee
15 August 1986
Reported
Committee on Environment and Public Works. Reported to Senate by Senator Simpson with an amendment in the nature of a substitute. Without written report.
Source: Committee
10 September 1986
Committee
Committee on Energy and Natural Resources received executive comment from Justice Department.
Source: Committee
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Reported to Senate amended, 2nd committee reporting
summary · EN · 15 August 1986
Reported to Senate amended, 1st committee reporting
summary · EN · 24 April 1986
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in Senate
summary · EN · 24 May 1985
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Sponsors
- Sen. Simpson, Alan K. [R-WY] · R · Sponsor
- Sen. McClure, James A. [R-ID] · R · Sponsor
- · ssev00 · Standing
- · sseg00 · Standing
Related records
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/99th-congress/senate-bill/1225
- Open data entity: https://api.congress.gov/v3/bill/99/s/1225
- us · 99-s-1225 · source updated 24 March 2026