United States · Bill · S
S. 1421 (96th)
A bill to authorize the Secretary of the Interior to engage in feasibility studies of various potential hydroelectric power projects.
Introduced
27 June 1979
Last action
—
Status
Referred to Senate Committee on Energy and Natural Resources.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Directs the Secretary of the Interior to conduct feasibility studies of the following hydroelectric power projects: (1) Black Canyon Dam powerplant, Idaho; (2) Cle Elum and Tieton Dams powerplants, Washington; (3) Hungary Horse powerplant enlargement and reregulating reservoir, Montana; (4) Headgate Rock powerplant, Arizona; (5) Owyhee Dam powerplant, Oregon; (6) Potholes Canal Chute-Station 3480+45 powerplant, Washington; (7) Wickiup Dam powerplant, Oregon; (8) Tiber Dam powerplant, Montana; (9) New Siphon Drop powerplant, California; (10) Green Mountain Afterbay, Colorado; and (11) Alcova pumped-storage plant, Wyoming.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 27 June 1979
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/96th-congress/senate-bill/1421
- Open data entity: https://api.congress.gov/v3/bill/96/s/1421