PoliticalRepoPoliticalRepo

United States · Bill · S

S. 1421 (96th)

A bill to authorize the Secretary of the Interior to engage in feasibility studies of various potential hydroelectric power projects.

referredUnited States· United States Congress· EN

Introduced

27 June 1979

Last action

Status

Referred to Senate Committee on Energy and Natural Resources.

Sponsors

Subjects

Discovery layer

Source updated

24 March 2026

Summary

Directs the Secretary of the Interior to conduct feasibility studies of the following hydroelectric power projects: (1) Black Canyon Dam powerplant, Idaho; (2) Cle Elum and Tieton Dams powerplants, Washington; (3) Hungary Horse powerplant enlargement and reregulating reservoir, Montana; (4) Headgate Rock powerplant, Arizona; (5) Owyhee Dam powerplant, Oregon; (6) Potholes Canal Chute-Station 3480+45 powerplant, Washington; (7) Wickiup Dam powerplant, Oregon; (8) Tiber Dam powerplant, Montana; (9) New Siphon Drop powerplant, California; (10) Green Mountain Afterbay, Colorado; and (11) Alcova pumped-storage plant, Wyoming.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.