United States · Bill · S
S. 1437 (97th)
A bill to authorize the construction of a project for pumped-storage hydropower development and other purposes at Fort Randall Dam-Lake Francis Case, South Dakota.
Introduced
25 June 1981
Last action
25 June 1981 · Introduced
Status
Read second time and referred to Senate Committee on Environment and Public Works.
Sponsors
Rep. Abdnor, James [R-SD-2], Rep. Pressler, Larry [R-SD-1]
Subjects
Energy
Source updated
14 January 2025
Summary
Authorizes the Secretary of the Army, through the Chief of Engineers, to construct a pumped-storage hydroelectric facility as part of the Fort Randall Dam-Lake Francis Case project, South Dakota.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
25 June 1981
Introduced
Read second time and referred to Senate Committee on Environment and Public Works.
Source: IntroReferral
25 June 1981
Introduced
Introduced in Senate
Source: IntroReferral
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 25 June 1981
Sponsors
- Rep. Abdnor, James [R-SD-2] · R · Sponsor
- Rep. Pressler, Larry [R-SD-1] · R · Sponsor
- · ssev00 · Standing
Related records
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/97th-congress/senate-bill/1437
- Open data entity: https://api.congress.gov/v3/bill/97/s/1437
- us · 97-s-1437 · source updated 14 January 2025