Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · S

S. 1740 (116th)

Flexible Grid Infrastructure Act of 2019

referredUnited States· United States Congress· EN

Introduced

5 June 2019

Last action

5 June 2019 · Introduced

Status

Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sen. Wyden, Ron [D-OR]

Subjects

Energy, Transport

Source updated

24 March 2026

Energy · Transport

Summary

Flexible Grid Infrastructure Act of 201 9 This bill requires the Federal Energy Regulatory Commission (FERC) and the Department of Energy (DOE) to address the flexibility, reliability, resilience, affordability, efficiency, and security of the electric grid. Specifically, FERC and DOE must (1) access the technical and economic potential of distributed energy resources, and (2) establish an online clearinghouse of data relating to distributed energy resources. A distributed energy resource means an electric device that can produce or consume energy that is located on the grid distribution system or on the customer side of the electric grid (e.g., solar roofs). DOE must also provide technical assistance, an action plan, tools, and information relating to the deployment of distributed energy resources and grid-scale energy storage; research and develop the electrification of transportation, heating, and other technologies; develop model standards to assist states, electric cooperatives, and publicly owned electric utilities in the voluntary updating of standards for resource and energy assurance planning, ensuring distribution-grid reliability from natural disasters, and improving security; evaluate whether new performance standards and testing procedures are needed to ensure the resilience of electrical equipment to security threats or natural disasters; develop guidelines for calculating the costs and benefits of investments in resilience and security solutions for the electric grid; provide related workforce training; and establish the Flexible Grid Challenge 2024, a grant program that helps states enhance the peak load management and flexibility of the electric grid.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 5 June 2019

    Introduced

    Read twice and referred to the Committee on Energy and Natural Resources.

    Source: IntroReferral

  2. 5 June 2019

    Introduced

    Introduced in Senate

    Source: IntroReferral

Votes

No vote records are attached yet.

Versions

Documents

3 official files

Introduced in Senate (text)

View fileDownload file

This file cannot be previewed here. Use View or Download.

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in Senate (text)

    Introduced in Senate · EN · 5 June 2019

    ViewDownloadOpen at official source

  • Introduced in Senate (PDF)

    Introduced in Senate · EN · 5 June 2019

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in Senate

    summary · EN · 5 June 2019

    Open at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.