PoliticalRepoPoliticalRepo

United States · Bill · S

S. 2014 (108th)

Electric Reliability Act of 2004

referredUnited States· United States Congress· EN

Introduced

21 January 2004

Last action

Status

Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Subjects

Discovery layer

Source updated

24 March 2026

Summary

Electric Reliability Act of 2004 - Amends the Federal Power Act to extend Federal Energy Regulatory Commission (FERC) jurisdiction over each electric reliability organization (ERO), regional entity, and user, owner, and operator of a bulk-power system for purposes of approving reliability standards and enforcing compliance with this Act. Prescribes procedural guidelines for: (1) certification as an ERO; (2) filing of reliability standards; and (3) imposition of penalties by either an ERO or FERC for noncompliance with this Act Requires an ERO to: (1) file with FERC for approval any proposed rule or rule change; and (2) take all appropriate steps to gain recognition in Canada and Mexico. Requires an ERO to assess periodically the reliability and adequacy of the interconnected bulk-power system in North America. Directs FERC to establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than half of their electric loads served within the region Declares this Act inapplicable to Alaska or Hawaii.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

3 official files

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.