Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · S

S. 2292 (97th)

A bill to amend section 205 of the Federal Power Act (16 U.S.C. 824d) relating to inclusion of construction work in progress in the wholesale rate base of public utilities.

referredUnited States· United States Congress· EN

Introduced

29 March 1982

Last action

29 March 1982 · Introduced

Status

Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sen. Metzenbaum, Howard M. [D-OH], Sen. Levin, Carl [D-MI]

Subjects

Energy

Source updated

24 March 2026

Energy

Summary

Amends the Federal Power Act to require the Federal Energy Regulatory Commission to approve, upon application by a public utility and after examination of the propriety of the costs involved, the inclusion in the wholesale rate base of construction work in progress (defined as the interest portion of the debt incurred in constructing a facility used to generate or transmit electric energy) with respect to: (1) construction of pollution control facilities; or (2) conversion of oil or gas-fired facilities. Provides that public utility charges based upon costs associated with other construction work in progress shall be considered unreasonable.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 29 March 1982

    Introduced

    Read twice and referred to the Committee on Energy and Natural Resources.

    Source: IntroReferral

  2. 29 March 1982

    Introduced

    Introduced in Senate

    Source: IntroReferral

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.