Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · S

S. 465 (119th)

GRID Power Act

openUnited States· United States Congress· EN

Introduced

6 February 2025

Last action

15 April 2026 · Committee

Status

Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.

Sponsors

Sen. Hoeven, John [R-ND], Sen. Young, Todd [R-IN], Sen. Marshall, Roger [R-KS], Sen. Moreno, Bernie [R-OH]

Subjects

Energy

Source updated

14 July 2026

Energy

Summary

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects).  Under the bill, d ispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid. First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably.  Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 6 February 2025

    Introduced

    Read twice and referred to the Committee on Energy and Natural Resources.

    Source: IntroReferral

  2. 6 February 2025

    Introduced

    Introduced in Senate

    Source: IntroReferral

  3. 15 April 2026

    Committee

    Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.

    Source: Committee

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

2 official files

Introduced in Senate

View fileDownload file

This file cannot be previewed here. Use View or Download.

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in Senate

    Introduced in Senate · EN · 6 February 2025

    ViewDownloadOpen at official source

  • Introduced in Senate

    summary · EN · 6 February 2025

    Open at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.