S. 543 (104th)
A bill to extend the deadline under the Federal Power Act applicable to the construction of a hydroelectric project in Oregon, and for other purposes.
Introduced
13 March 1995
Last action
—
Status
Placed on Senate Legislative Calendar under General Orders. Calendar No. 138.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Directs the Federal Energy Regulatory Commission, at the request of a specified licensee, to extend the time for completion of a certain project to the later of: (1) October 31, 2002; or (2) the date that is one year after the date on which the Army Corps of Engineers completes construction of water temperature control structures at the Blue River Dam. Requires the licensee to file an annual status report with such Commission.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
5 official files
Reported to Senate (text)
Reported to Senate · EN · 11 July 1995
Reported to Senate (PDF)
Reported to Senate · EN · 11 July 1995
Introduced in Senate (text)
Introduced in Senate · EN · 13 March 1995
Introduced in Senate (PDF)
Introduced in Senate · EN · 13 March 1995
Introduced in Senate
summary · EN · 13 March 1995
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/104th-congress/senate-bill/543
- Open data entity: https://api.congress.gov/v3/bill/104/s/543