United States · Bill · S
S. 730 (115th)
A bill to extend the deadline for commencement of construction of certain hydroelectric projects.
Introduced
27 March 2017
Last action
—
Status
Placed on Senate Legislative Calendar under General Orders. Calendar No. 101.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Gathright Hydroelectric Project located in Alleghany County, Virginia, and the Flannagan Dam and Reservoir Hydroelectric Project located in Dickenson County, Virginia. Additionally, FERC may reinstate either construction license if it is expired.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
6 official files
Reported to Senate (text)
Reported to Senate · EN · 24 May 2017
Reported to Senate (PDF)
Reported to Senate · EN · 24 May 2017
Reported to Senate without amendment
summary · EN · 24 May 2017
Introduced in Senate (text)
Introduced in Senate · EN · 27 March 2017
Introduced in Senate (PDF)
Introduced in Senate · EN · 27 March 2017
Introduced in Senate
summary · EN · 27 March 2017
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/115th-congress/senate-bill/730
- Open data entity: https://api.congress.gov/v3/bill/115/s/730