United States · Law · S
S. 2796 (106th)
Water Resources Development Act of 2000
Introduced
27 June 2000
Last action
—
Status
Became Public Law No: 106-541.
Sponsors
—
Subjects
Discovery layer
Source updated
7 April 2025
Summary
Water Resources Development Act of 2000 - Title I: Water Resources Projects - Authorizes the Secretary of the Army (Secretary) to carry out: (1) a specified project for navigation, New York-New Jersey Harbor; and (2) specified water resources projects (subject to completion of a favorable final report of the Chief of Engineers by December 31, 2000) in Alaska, Arizona, California, Florida, Hawaii, Indiana and Kentucky, Louisiana to the Gulf of Mexico, New Jersey, Tennessee, and Wyoming and on the Ohio River. (Sec. 102) Directs the Secretary to conduct a study of, and authorizes the Secretary, if the Secretary determines that a project is feasible, to authorize the Secretary to carry out, a project, for: (1) beach restoration and protection at Lake Palourde and St. Bernard, Louisiana; (2) navigation at Houma Navigation Canal and Vidalia Port, Louisiana; (3) removal of snags and clearing and straightening of channels for flood control at Bayou Manchac and Black Bayou and Hippolyte Coulee, Louisiana; (4) emergency streambank protection at specified locations in Louisiana; (5) flood damage reduction or control at various locations in Idaho, Louisiana, Mississippi, and Tennessee; and (6) improvement of the quality of the environment at various locations in Louisiana and Ohio. (Sec. 108) Authorizes the Secretary to carry out projects regarding: (1) beneficial uses of dredged material at specified locations in Louisiana and Ohio; and (2) aquatic ecosystem restoration at specified locations in Louisiana, New Hampshire, Ohio, and Oregon. (Sec. 110) Amends the Water Resources Development Act (WRDA) of 1999 to: (1) include Perry Creek, Iowa, among appropriate locations to be examined with respect to the flood mitigation and riverine restoration program; and (2) authorize the Secretary to design and construct a shore protection project at Fort Canby State Park, Benson Beach, Washington, including beneficial use of dredged material from Federal navigation projects. Title II: General Provisions - Modifies provisions of the Flood Control Act of 1970 regarding water resources projects to provide that an agreement entered into by a State may reflect that it does not obligate future appropriations (currently, future State legislative appropriations) for performance and payment when obligating future appropriations would be inconsistent with State constitutional or statutory limitations of the State or a body politic of the State. (Sec. 202) Amends the WRDA of 1986 to remove provisions authorizing a study of water resources needs of river basins and regions. Authorizes the Secretary to assess the water resources needs of river basins and watersheds of the United States, including needs relating to: (1) ecosystem protection and restoration; (2) flood damage reduction; (3) navigation and ports; (4) watershed protection; (5) water supply; and (6) drought preparedness. Directs the Secretary, in selecting river basins and watersheds for assessment, to give priority to the Delaware River basin. Authorizes the Secretary to accept contributions from Federal, tribal, State, interstate, and local governmental entities to the extent that such contributions will facilitate completion of the assessment. Sets forth cost-sharing requirements. Authorizes appropriations. (Sec. 203) Authorizes the Secretary to study and determine the feasibility of carrying out water resources development projects that: (1) will substantially benefit Indian tribes; and (2) are located primarily within Indian country or in proximity to Alaska Native villages. Requires the Secretary to: (1) consult with the Secretary of the Interior concerning such studies; (2) integrate civil works activities of the Department of the Army (the Department) with activities of the Department of the Interior; and (3) consider the authorities and programs of the Department of the Interior and other Federal agencies in any recommendations concerning carrying out projects studied. Sets forth provisions regarding priority projects and cost sharing. Authorizes appropriations. (Sec. 204) Amends the WRDA of 1986 to make any cost-sharing agreement for a feasibility study, or for construction of an environmental protection and restoration project (currently limited to flood control or agricultural water supply projects), subject to the ability of the non-Federal interest to pay. Modifies provisions regarding determination of the ability of a non-Federal interest to pay. Directs the Secretary to promulgate revised criteria and procedures governing such ability within 18 months. Authorizes the Secretary, in revising criteria, to consider criteria relating to: (1) the financial ability of the non-Federal interest to carry out its cost-sharing responsibilities; or (2) additional assistance that may be available from other Federal or State sources. (Sec. 205) Authorizes the Secretary to: (1) carry out a program to reduce vandalism and destruction of property at water resources development projects under the jurisdiction of the Department, including by providing rewards to individuals who furnish information or evidence leading to the arrest and prosecution of individuals causing damage to Federal property; and (2) participate in the National Recreation Reservation Service on an interagency basis and pay the Department's share of activities required to implement, operate, and maintain the Service. (Sec. 207) Amends the WRDA of 1990 to: (1) provide that activities currently performed by personnel under the direction of the Secretary in connection with the operation and maintenance of hydroelectric power generating facilities at Corps of Engineers water resources projects are to be considered as inherently governmental functions and not commercial activities (current law) in cases in which the activities require specialized training relating to hydroelectric power generation; and (2) double the amount authorized to be appropriated for interagency and international support to address problems of national significance to the United States. (Sec. 209) Authorizes the Secretary, in consultation with affected Indian tribes, to identify and set aside areas at Department civil works projects that may be used to re-bury Native American remains that have been: (1) discovered on project land; and (2) rightfully claimed by a lineal descendant or Indian tribe in accordance with applicable Federal law. Permits the Secretary, in consultation with and with the consent of the lineal descendant or the affected tribe, to recover and re-bury, at full Federal expense, the remains at the areas identified and set aside. Authorizes the Secretary to convey to a tribe for use as a cemetery an area at a civil works project that is so identified and set aside. Directs the Secretary to retain any right-of-way, easement, or other property interest that the Secretary determines to be necessary to carry out the authorized purposes of the project. (Sec. 210) Amends the river and harbor Act of March 3, 1899, to provide that the approval required of the location and plans, or any modification of plans, of any dam or dike applies only to a dam or dike that, if constructed, would completely span a waterway used to transport interstate or foreign commerce in such a manner that actual, existing interstate or foreign commerce could be adversely affected. Specifies that any other dam or dike that is proposed to be built in any other navigable water of the United States shall not be subject to the approval requirements of this section. (Sec. 211) Rewrites provisions of the WRDA of 1986 regarding project deauthorizations to direct the Secretary to annually submit to Congress a list of projects and separable elements thereof (projects) that are authorized for construction and for which no Federal funds were obligated for construction during the four preceding fiscal years. Directs that any water resources project authorized for construction be deauthorized effective at the end of the seven-year period beginning on the date of the most recent authorization or reauthorization of the project unless Federal funds have been obligated for construction by the end of that period. Directs the Secretary to submit to Congress annually a list of authorized projects for which no Federal funds have been obligated for construction and for which no Federal funds have been obligated for construction of the project during the two full fiscal years preceding the date of submission of the list. Directs that any water resources project for which Federal funds have been obligated for construction be deauthorized effective at the end of any five-fiscal year period during which Federal funds specifically identified for construction of the project have not been obligated for construction. Defines "construction" and "physical work under a construction contract." Directs the Secretary: (1) upon submission of the lists, to notify each Senator in whose State, and each Member of the House of Representatives in whose district, the affected project is or would be located; and (2) to publish annually in the Federal Register a list of all projects deauthorized under this section. (Sec. 212) Amends the WRDA to: (1) require that guidelines for preparation of flood plain management plans by non-Federal interests address potential measures, practices, and policies (current law) that non-Federal interests shall adopt and enforce to reduce loss of life, injuries, and specified other adverse impacts and to preserve and enhance natural flood plain values; and (2) require non-Federal interests to take measures to preserve the level of flood protection provided by such a project. Makes this section applicable to any project with respect to which the Secretary and the non-Federal interest have not entered a project cooperation agreement on or before the date of this Act's enactment. (Sec. 213) Amends the WRDA of 1990 to provide that, with respect to environmental dredging projects, a non-Federal sponsor may include a nonprofit entity, with the consent of the affected local government. Title III: Project-Related Provisions - Directs the Secretary to credit toward the non-Federal share of the costs of the study to determine the feasibility of the reservoir and associated improvements in the vicinity of Boydsville, Arkansas, authorized by the WRDA of 1999, not more than $250,000 of the costs of the relevant planning and engineering investigations carried out by State and local agencies if the Secretary finds that the investigations are integral to the scope of the feasibility study. (Sec. 302) Amends the WRDA of 1999 regarding the White River Basin project, Arkansas and Missouri, to authorize the Secretary to reallocate the amounts of project storage that are recommended by the report to Congress. Prohibits obligating funds to carry out work unless it does not significantly impact other authorized project purposes. Extends the deadline for submission of the report until July 30, 2002. Requires the report to include determinations concerning whether project storage should be reallocated to sustain the tail water trout fisheries. (Sec. 303) Modifies the project for shore protection, Gasparilla and Estero Island segments, Lee County, Florida, to authorize the Secretary to enter into agreement with the non-Federal interest to carry out the project in accordance with provisions of the WRDA of 1992 if the Secretary determines that the project is technically sound, environmentally acceptable, and economically justified. (Sec. 304) Directs the Secretary to carry out planning, engineering, and design of an adaptive ecosystem restoration, flood damage reduction, and erosion protection project along the upper Snake River within and adjacent to the Fort Hall Indian Reservation, Idaho, provided that the Shoshone-Bannock Indian Tribe provide land, easements, and rights-of-way necessary for implementation of the project. Authorizes the Secretary to construct and adaptively manage for ten years, at full Federal expense, a project if the Secretary determines that the project: (1) is a cost-effective means of providing ecosystem restoration, flood damage reduction, and erosion protection; (2) is environmentally acceptable and technically feasible; and (3) will improve the economic and social conditions of the Shoshone-Bannock Indian Tribe. (Sec. 305) Directs the Secretary to credit toward the non-Federal share of the costs of the study to determine the feasibility of improvements to the upper Des Plaines River and tributaries, phase 2, Illinois and Wisconsin, authorized by the WRDA of 1999, the costs of work carried out by the non-Federal interests in Lake County, Illinois, before the date of execution of the feasibility study cost-sharing agreement, if: (1) the Secretary and the non-Federal interests enter into a feasibility study cost-sharing agreement; and (2) the Secretary finds that the work is integral to the scope of the study. (Sec. 306) Directs the Secretary to credit toward the non-Federal share of the project costs of the Mississippi River and tributaries, Morganza, Louisiana, to the Gulf of Mexico project the cost of any work carried out by the non-Federal interests for interim flood protection after March 31, 1989, if the Secretary finds that the work is compatible with, and integral to, the project. (Sec. 307) Modifies the project for mitigation of fish and wildlife losses, Red River Waterway, Louisiana, to authorize the purchase of mitigation land from willing sellers in any of the parishes that comprise the Red River Waterway District. (Sec. 308) Authorizes the Secretary to provide design and construction assistance for recreational facilities in the State of Maryland at the William Jennings Randolph Lake (Bloomington Dam), Maryland and West Virginia, project. Directs the Secretary to require the non-Federal interest to provide 50 percent of the costs of designing and constructing the recreational facilities. (Sec. 309) Authorizes the project for navigation, New Madrid County Harbor, Missouri. (Sec. 310) Directs the Secretary, regarding the project for navigation, Pemiscot County Harbor, Missouri, to provide credit to the Pemiscot County Port Authority, or an agent of the Authority, for costs incurred by the Authority or agent in carrying out construction work for the project after December 31, 1997, if the Secretary finds that the construction work is integral to the project. (Sec. 311) Provides for an exchange between the United States and S.S.S., Inc., of lands located in Pike County, Missouri, subject to specified conditions. (Sec. 312) Directs the Secretary to carry out a project at Fort Peck Lake, Montana, for the design and construction of a fish hatchery and such associated facilities as are necessary to sustain a multi-species fishery. Sets forth cost sharing provisions. Authorizes appropriations. (Sec. 313) Authorizes the Secretary to carry out: (1) dredging of Mines Falls Park, New Hampshire (and authorizes appropriations); and (2) maintenance dredging of the Sagamore Creek Channel, New Hampshire. (Sec. 315) Modifies the project for flood control, Passaic River, New Jersey and New York, to emphasize non-structural approaches for flood control as alternatives to the construction of the Passaic River tunnel element, while maintaining the integrity of other separable mainstream project elements, wetland banks, and other independent projects that were authorized to be carried out in the Passaic River Basin before this Act's enactment date. Directs the Secretary to review: (1) the Passaic River Floodway Buyout Study, dated October 1995, to calculate the benefits of a buyout and environmental restoration using a specified method used to calculate the benefits of structural projects under the WRDA of 1990; and (2) the Passaic River Buyout Study of the ten-year floodplain beyond the floodway of the Central Passaic River Basin, dated September 1995, to calculate the benefits of a buyout and environmental restoration using such method. Requires the Secretary: (1) to reevaluate the acquisition, from willing sellers, for flood protection purposes, of wetlands in the Central Passaic River Basin to supplement a wetland acquisition authorized by the WRDA of 1990; and (2) upon determining that the acquisition is cost-effective, to purchase the wetlands, with the goal of purchasing not more than 8,200 acres. Directs the Secretary to review relevant reports and conduct a study to determine the feasibility of carrying out a project for environmental restoration, erosion control, and streambank restoration along the Passaic River from Dundee Dam to Kearny Point, New Jersey. Directs the Secretary to establish the Passaic River Flood Management Task Force to provide advice to the Secretary concerning all aspects of the Passaic River flood management project. Requires the task force to submit annually to the Secretary and to the non-Federal interest a report describing the achievements of the project in preventing flooding and any impediments to completion of the project. Amends provisions of the WRDA of 1986 regarding the Passaic River Basin to direct the Secretary to carry out such provisions in a manner that is consistent with New Jersey's Blue Acres Program. Authorizes the Secretary to study the feasibility of conserving land in the Highlands region of New Jersey and New York to provide additional flood protection for residents of the Passaic River Basin. Prohibits the Secretary from obligating any funds to carry out design or construction of the tunnel element of the Passaic River flood control project. (Sec. 316) Modifies the project for shoreline protection, Rockaway Inlet to Norton Point (Coney Island Area), New York, to authorize the Secretary to construct T-groins to improve sand retention down drift. Specifies the Federal and non-Federal share. (Sec. 317) Extinguishes the reversionary interests and use restrictions relating to port or industrial purposes with respect to specified deeds on properties located on the John Day Pool in Oregon and Washington. Extinguishes the human habitation or other building structure use restriction in each area where the elevation is above the standard project flood elevation. Authorizes the use of fill material to raise low areas above the standard project flood elevation, except in any low area constituting wetland for which a permit under the Federal Water Pollution Control Act would be required. (Sec. 318) Amends the WRDA of 1999 to require that the non-Federal interest for the Fox Point Hurricane Barrier project, Providence, Rhode Island, receive credit toward the non-Federal share of project costs, or reimbursement, for the Federal share of the costs of repairs authorized that are incurred by the non-Federal interest before the date of execution of the project cooperation agreement. (Sec. 319) Requires that: (1) the Secretary enter into an agreement for the city of Grand Prairie, Texas, to assume all responsibilities of the Trinity River Authority under a specified contract, other than financial responsibilities, except that the Authority shall be relieved of all financial responsibilities under the contract as of the date on which the Secretary enters into the agreement with the city; (2) the city pay the Federal Government $4,290,000 in two installments in consideration of the agreement; and (3) the agreement include a provision requiring the city to assume responsibility for all costs associated with operation and maintenance of the recreation facilities included in the contract. (Sec. 320) Authorizes the Secretary to participate in critical restoration projects in the Lake Champlain watershed, New York and Vermont. Sets forth provisions regarding the types of projects eligible for assistance, a public ownership requirement, project selection, and cost sharing. Authorizes appropriations. (Sec. 321) Modifies the project for sediment control, Mount St. Helens, Washington, to authorize the Secretary to maintain for Longview, Kelso, Lexington, and Castle Rock on the Cowlitz River specified flood protection levels. (Sec. 322) Authorizes the Secretary to participate in critical restoration projects in the area of Puget Sound, Washington, and adjacent waters. Sets forth provisions regarding project selection, prioritization of projects, and cost sharing. Authorizes appropriations. (Sec. 323) Amends the WRDA of 1992 to provide that, with regard to the Fox River System, Wisconsin, the terms and conditions may include one or more payments to assist the State of Wisconsin in paying the costs of repair and rehabilitation of the transferred locks and appurtenant features. (Sec. 324) Amends the WRDA of 1986 to increase appropriations for projects of alternative or beneficially modified habitats for fish and wildlife. Directs that such projects include the construction of reefs and related clean shell substrate for fish habitat, including manmade three-dimensional oyster reefs, in the Chesapeake Bay and its tributaries in Maryland and Virginia, which reefs shall be preserved as permanent sanctuaries by the non-Federal interests. Requires the Chief of Engineers to solicit participation by, and the services of, commercial watermen for assistance in the construction of such reefs. (Sec. 325) Directs the Secretary, in operating and maintaining Federal channels and harbors of, and the connecting channels between, the Great Lakes to conduct such dredging as is necessary to ensure minimal operation depths consistent with the original authorized depths of the channels and harbors when water levels in the Great Lakes are, or are forecast to be, below the International Great Lakes Datum of 1985. (Sec. 326) Directs the Secretary, within one year, to develop a plan for activities of the Corps of Engineers that support the management of Great Lakes fisheries. Requires that the plan make use of and incorporate documents that relate to the Great Lakes and that are in existence on the date of this Act's enactment, such as lake-wide management and remedial action plans. Directs the Secretary to: (1) develop the plan in cooperation with the signatories to the Joint Strategic Plan for Management of the Great Lakes Fisheries and other affected interests; (2) plan, design, and construct projects to support the restoration of the fishery, ecosystem, and beneficial uses of the Great Lakes; and (3) develop a program to evaluate the success of such projects. Sets forth provisions regarding cooperative agreements, relationship to other Great Lakes activities, and cost sharing. Authorizes appropriations. (Sec. 327) Amends provisions of the WRDA of 1990 regarding Great Lakes remedial action plans and sediment remediation to decrease, from 50 to 35, the percentage of project costs that non-Federal interests shall contribute. Authorizes appropriations at an increased level. (Sec. 328) Amends provisions of the WRDA of 1996 regarding sediment management to set the non-Federal share of the costs of developing a tributary sediment transport model at 50 percent. Authorizes additional appropriations. (Sec. 329) Directs the Secretary, by December 31, 2002, to carry out a demonstration project for the use of innovative sediment treatment technologies for the treatment of dredged material from Long Island Sound. Authorizes appropriations. (Sec. 330) Directs the Secretary to perform an assessment of the condition of water resources and related ecosystems in New England to identify problems and needs for restoring, preserving, and protecting water resources, ecosystems, wildlife, and fisheries, including: (1) development of criteria for identifying and prioritizing the most critical problems and needs; and (2) a framework for development of watershed or regional restoration plans. Requires the Secretary: (1) to develop and make available for public review and comment criteria for identifying and prioritizing critical problems and needs and a framework for development of watershed or regional restoration plans; (2) to submit to Congress a report on the assessment; (3) to develop and submit to Congress a comprehensive plan for restoring, preserving, and protecting the water resources and ecosystem in each watershed and region in New England; and (4) to identify critical restoration projects that will produce independent, immediate, and substantial restoration, preservation, and protection benefits. Sets forth provisions regarding agreements with non-Federal interests, project justification, time and cost limitations, and cost sharing. Authorizes appropriations. (Sec. 331) Deauthorizes specified navigation projects at: (1) Kennebunk River, Kennebunk and Kennebunkport, Maine; and (2) Wallabout Channel, Brooklyn, New York. Title IV: Studies - Authorizes the Secretary to conduct a study to determine the feasibility of carrying out beach erosion control, storm damage reduction, and other measures along the shores of Baldwin County, Alabama. (Sec. 402) Authorizes the Secretary to conduct a study to determine the feasibility of: (1) a reservoir and associated improvements to provide for flood control, recreation, water quality, and fish and wildlife in the vicinity of Bono, Arkansas; (2) modifying the project for flood control, Cache Creek Basin, California, to authorize construction of features to mitigate impacts of the project on the storm drainage system of the city of Woodland, California, that have been caused by construction of a new south levee of the Cache Creek Settling Basin; and (3) constructing flood control measures in the Estudillo Canal watershed, San Leandro, California, and the Laguna Creek watershed, Fremont, California, to provide a 100-year level of flood protection. (Sec. 406) Authorizes the Secretary to conduct a special study of plans to: (1) mitigate for the erosion and other impacts resulting from the construction of Camp Pendleton Harbor, Oceanside, California, as a wartime measure; and (2) restore beach conditions along the affected public and private shores to the conditions that existed before the construction of such harbor. (Sec. 407) Authorizes the Secretary to conduct: (1) a watershed study for the San Jacinto watershed, California (and authorizes appropriations); (2) a reconnaissance study to determine the Federal interest in dredging the mouth of the Choctawhatchee River, Florida, to remove the sand plug; (3) a study to determine the feasibility of stabilizing the historic fortifications and beach areas of Egmont Key, Florida, that are threatened by erosion; (4) a re-study of flooding and water quality issues in the upper Ocklawaha River basin, south of the Silver River, and the Apopka River and Palatlakaha River basins; (5) a study to determine the feasibility of carrying out multi-objective flood control activities along the Boise River, Idaho; and (6) a reconnaissance study to determine the Federal interest in carrying out multi-objective flood control and flood mitigation planning projects along the Wood River in Blaine County, Idaho. (Sec. 413) Authorizes the Secretary to conduct a study to determine the feasibility of: (1) carrying out projects for water-related urban improvements, including infrastructure development and improvements, in Chicago, Illinois; (2) deepening the navigation channel of the Atchafalaya River and Bayous Chene, Boeuf and Black, Louisiana, from 20 to 35 feet; (3) constructing navigation improvements for ingress and egress between the Port of Iberia, Louisiana, and the Gulf of Mexico, including channel widening and deepening; (4) constructing projects for hurricane protection in the coastal area of the State of Louisiana between Morgan City and the Pearl River; (5) constructing urban flood control measures on the east bank of the Mississippi River in St. John the Baptist Parish, Louisiana; (6) redesigning as anchorage a portion of the 11-foot channel of the project for navigation, Narraguagus River, Milbridge, Maine, and of reauthorizing for the purpose of maintenance as anchorage of portion of that project lying adjacent to and outside the limits of the 11-foot and the nine-foot channel; and (7) modifying the project for navigation, Portsmouth Harbor and Piscataqua River, Maine and New Hampshire, to increase the authorized width of turning basins in the Piscataqua River to 1000 feet. (Sec. 420) Authorizes the Secretary to conduct: (1) a comprehensive study of the water resources needs of the Merrimack River basin, Massachusetts and New Hampshire, taking into consideration studies conducted by the University of New Hampshire on environmental restoration of the Merrimack River System; (2) a study to determine the feasibility of modifying the project for navigation, Gulfport Harbor, Mississippi, to widen the channel from 300 to 450 feet and to deepen the South Harbor channel from 36 to 42 feet and the North Harbor channel from 32 to 36 feet. (Sec. 422) Authorizes the Secretary, in conjunction with the State of New Hampshire, to conduct a study to identify and evaluate potential upland disposal sites for dredged material originating from harbor areas located within the State. (Sec. 423) Authorizes the Secretary to conduct a study to determine the feasibility of conveying to the Secretary of the Interior land that was acquired by the Secretary to carry out the Pick-Sloan Missouri River Basin Program and that is located within the external boundaries of specified reservations in North Dakota, South Dakota, and Nebraska, to be held in trust for the benefit of the Indian tribes involved. (Sec. 424) Rewrites provisions of the WRDA of 1996 regarding the Cuyahoga River, Ohio, to authorize the Secretary to: (1) conduct a study to evaluate the structural integrity of the bulkhead system located on the Federal navigation channel along the Cuyahoga River near Cleveland, Ohio; and (2) provide to the non-Federal interest design analysis, plans and specifications, and cost estimates for repair or replacement of the bulkhead system. Sets the non-Federal share of the cost of the study at 35 percent. Authorizes appropriations. (Sec. 425) Authorizes the Secretary to conduct a study to determine the feasibility of carrying out projects for water supply and environmental restoration at the Ballville Dam on the Sandusky River at Fremont, Ohio. (Sec. 426) Authorizes the Secretary to evaluate the backwater effects specifically due to flood control operations on land around Grand Lake, Oklahoma and report to Congress on whether Federal actions have been a significant cause of such effects. Authorizes the Secretary to conduct a study to determine the feasibility of: (1) addressing the backwater effects of the operation of the Pensacola Dam, Grand/Neosho River basin; and (2) purchasing easements for any land that has been adversely affected by backwater flooding in the Grand/Neosho River basin. Sets a 100 percent Federal cost share of the feasibility study if the Secretary determines that Federal actions have been a significant cause of the backwater effects. (Sec. 427) Authorizes the Secretary to conduct a study to determine the feasibility of designating a permanent site in the State of Rhode Island for the disposal of dredged material. (Sec. 428) Directs the Secretary to use $200,000 from funds to be transferred from the Tennessee Valley Authority (TVA) to prepare a report of the Chief of Engineers for a replacement lock at Chickamauga Lock and Dam, Tennessee. (Sec. 429) Authorizes the Secretary to: (1) conduct a study to determine the feasibility of carrying out a project for flood control and related purposes along Miller Farms Ditch, Howard Road Drainage, and Wolf River Lateral D, Germantown, Tennessee; and (2) include environmental and water quality benefits in the justification analysis for the project. Sets forth provisions regarding the Federal and non-Federal share. (Sec. 430) Authorizes the Secretary to conduct a study to determine the feasibility of: (1) modifying the project for flood control, Horn Lake Creek and Tributaries, Tennessee and Mississippi, to provide a high level of urban flood protection to development along Horn Lake Creek (and requires that the study include a limited reevaluation of the project to determine the appropriate design, as desired by the non-Federal interests); (2) constructing a 12 foot deep and 125 foot wide channel from the Houston Ship Channel to Cedar Bayou, mile marker 11, Texas; (3) constructing barge lanes adjacent to both sides of the Houston Ship Channel from Bolivar Roads to Morgan Point, Texas, to a depth of 12 feet; and (4) modifying the project for San Antonio Channel improvement, Texas, to add environmental restoration and recreation as project purposes. (Sec. 434) Authorizes the Secretary to review the report of the Chief of Engineers on the Upper Puyallup River, Washington, and other specified reports to determine whether modifications to the recommendations contained in the reports are advisable to provide improvements to the water resources and watershed of the White River watershed downstream of Mud Mountain Dam, Washington. (Sec. 435) Authorizes the Secretary to: (1) conduct a study to determine the feasibility of providing coastal erosion protection for the Tribal Reservation of the Shoalwater Bay Indian Tribe on Willapa Bay, Washington; and (2) construct and maintain a project to provide coastal erosion protection for such reservation, at full Federal expense, if the Secretary determines that the project: (1) is a cost-effective means of providing erosion protection; (2) is environmentally acceptable and technically feasible; and (3) will improve the economic and social conditions of the Shoalwater Bay Indian Tribe. Requires the Tribe, as a condition of the project, to provide land, easements, right-of-way, and dredged material disposal areas necessary for the implementation of the project. Title V: Miscellaneous Provisions - Amends provisions of the WRDA of 1992 regarding visitors centers to direct the Secretary to: (1) construct a visitors center for the Army Corps of Engineers at Fort Smith, Arkansas (currently, Arkansas River) on land provided by the city of Fort Smith; and (2) establish and operate the Lower Mississippi River Museum and Riverfront Interpretive Site on property between the Mississippi River Bridge and the waterfront in downtown Vicksburg, Mississippi (currently, in the vicinity of that Bridge). (Sec. 502) Authorizes the Secretary to participate with the appropriate Federal and State agencies in the planning and management activities associated with the CALFED Bay-Delta Program. Directs the Secretary to integrate the activities of the Corps of Engineers in the San Joaquin and Sacramento River basins with the long-term goals of the Program. Sets forth provisions regarding cooperative activities and the area covered by the Program. Authorizes appropriations. (Sec. 503) Authorizes the Secretary to convey to the Ontonagon County Historical Society, at full Federal expense: (1) the lighthouse at Ontonagon, Michigan; and (2) the land underlying and adjacent to the lighthouse that is under the Secretary's jurisdiction. Directs the Secretary to determine the extent of the land conveyance and the exact acreage and legal description of the land to be conveyed and to prepare a map that clearly identifies any land to be conveyed. Authorizes the Secretary to obtain all necessary easements and rights-of-way and to impose such terms, conditions, reservations, and restrictions on the conveyance as the Secretary determines to be necessary to protect the public interest. Makes: (1) the Secretary responsible for any necessary environmental response required as a result of the prior Federal use or ownership of the land and improvements conveyed; and (2) the Ontonagon County Historical Society responsible, after the conveyance of the land, for any additional operation, maintenance, repair, rehabilitation, or replacement costs associated with the lighthouse or the conveyed land and improvements.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
15 official files
Enrolled Bill (text)
Enrolled Bill (text)
Enrolled Bill · EN
Enrolled Bill (PDF)
Enrolled Bill · EN
Public Law (text)
Public Law · EN · 11 December 2000
Public Law (PDF)
Public Law · EN · 11 December 2000
Conference report filed in House
summary · EN · 31 October 2000
Engrossed Amendment House (text)
Engrossed Amendment House · EN · 19 October 2000
Engrossed Amendment House (PDF)
Engrossed Amendment House · EN · 19 October 2000
Engrossed in Senate (text)
Engrossed in Senate · EN · 26 September 2000
Engrossed in Senate (PDF)
Engrossed in Senate · EN · 26 September 2000
Reported to Senate (text)
Reported to Senate · EN · 27 July 2000
Reported to Senate (PDF)
Reported to Senate · EN · 27 July 2000
Reported to Senate with amendment(s)
summary · EN · 27 July 2000
Introduced in Senate (text)
Introduced in Senate · EN · 27 June 2000
Introduced in Senate (PDF)
Introduced in Senate · EN · 27 June 2000
Introduced in Senate
summary · EN · 27 June 2000
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/106th-congress/senate-bill/2796
- Open data entity: https://api.congress.gov/v3/bill/106/s/2796