Skip to content
PoliticalRepoPoliticalRepo

European Union · Record · TJ

CELEX 62025TJ0098

Judgment of the General Court (Tenth Chamber) of 4 November 2026.#Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) v European Climate, Infrastructure and Environment Executive Agency.#Energy – Connecting Europe Facility – Regulation (EU, Euratom) No 347/2013 – Calls for proposals – Cross-border energy infrastructure projects – Proposal for the construction of a pipeline in the eastern Mediterranean Sea – Rejection of the proposal as inadmissible – Obligation to state reasons – Error of assessment – Right to be heard – Liability.#Case T-98/25.

decidedEuropean Union· Court of Justice of the European Union· EN

Introduced

4 November 2026

Last action

4 November 2026 · Decided

Status

decided

Sponsors

—

Subjects

Energy, Climate

Source updated

4 November 2026

Energy · Climate

Official titles

Authentic titles published by the source. The stored canonical title is not replaced.

1 official language
  • French

    Arrêt du Tribunal (dixième chambre) du 4 novembre 2026.#Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) contre Agence exécutive européenne pour le climat, les infrastructures et l’environnement.#Énergie – Mécanisme pour l’interconnexion en Europe – Règlement (UE) no 347/2013 – Appels à propositions – Projets d’infrastructure énergétique transfrontaliers – Proposition relative à la construction d’un gazoduc dans l’est de la mer Méditerranée – Rejet de la proposition pour irrecevabilité – Obligation de motivation – Erreur d’appréciation – Droit d’être entendu – Responsabilité.#Affaire T-98/25.

Records

Official record CELEX 62025TJ0098 from European Union at Court of Justice of the European Union. Dated 4 November 2026. Status: decided.

Timeline

  1. 4 November 2026

    Decided

    Source: work_date_document

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

2 official files

Arrêt du Tribunal (dixième chambre) du 4 novembre 2026.#Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) contre Agence exécutive européenne pour le climat, les infrastructures et l’environnement.#Énergie – Mécanisme pour l’interconnexion en Europe – Règlement (UE) no 347/2013 – Appels à propositions – Projets d’infrastructure énergétique transfrontaliers – Proposition relative à la construction d’un gazoduc dans l’est de la mer Méditerranée – Rejet de la proposition pour irrecevabilité – Obligation de motivation – Erreur d’appréciation – Droit d’être entendu – Responsabilité.#Affaire T-98/25.

View fileDownload file

Reading translation

Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Arrêt du Tribunal (dixième chambre) du 4 novembre 2026.#Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) contre Agence exécutive européenne pour le climat, les infrastructures et l’environnement.#Énergie – Mécanisme pour l’interconnexion en Europe – Règlement (UE) no 347/2013 – Appels à propositions – Projets d’infrastructure énergétique transfrontaliers – Proposition relative à la construction d’un gazoduc dans l’est de la mer Méditerranée – Rejet de la proposition pour irrecevabilité – Obligation de motivation – Erreur d’appréciation – Droit d’être entendu – Responsabilité.#Affaire T-98/25.

    judgment · FR · 4 November 2026

    ViewDownloadOpen at official source

  • Judgment of the General Court (Tenth Chamber) of 4 November 2026.#Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) v European Climate, Infrastructure and Environment Executive Agency.#Energy – Connecting Europe Facility – Regulation (EU, Euratom) No 347/2013 – Calls for proposals – Cross-border energy infrastructure projects – Proposal for the construction of a pipeline in the eastern Mediterranean Sea – Rejection of the proposal as inadmissible – Obligation to state reasons – Error of assessment – Right to be heard – Liability.#Case T-98/25.

    judgment · EN · 4 November 2026

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

  • · GCEU · General Court

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.