PoliticalRepoPoliticalRepo

France · Question · Question écrite

3673

Question 3673 — secondary education

answeredFrance· National Assembly· FR

Introduced

4 February 2025

Last action

28 October 2025 · Réponse

Status

répondue

Sponsors

Subjects

Discovery layer

Source updated

28 October 2025

Summary

Mrs. Zahia Hamdane questions the Minister of State, Minister of National Education, Higher Education and Research, about the unacceptable situation in which the students and staff of the Amiens school campus find themselves. For several weeks, they have been studying and working in unworthy conditions due to largely insufficient heating, incapable of ensuring a minimum of thermal comfort. mrs the MP recalls that, at the beginning of January 2025, the students of this establishment decided to go on strike to raise awareness about this recurring problem. The conditions are particularly alarming: sports classes take place in a gymnasium where the temperature does not exceed 5°C and classrooms struggle to reach 12°C. The interns, for their part, have to sleep with their coats on in freezing dormitories. This situation repeats every year, plunging the entire school community into permanent worry as winter approaches. However, despite the 65 million euros invested in recent years, no complete renovation of the heating system has been considered. The school complex, made up of around thirty buildings scattered over a 40 hectare site, still relies on a single boiler, clearly unsuitable for the needs of the establishment. Faced with the emergency, the president of the region had additional heaters delivered, but this temporary solution raises new concerns. The electrical installations in the corridors, which are insufficient, cannot support the load linked to these devices, regularly leading to power cuts throughout an entire corridor. This situation forces students to choose between heating themselves, drying their hair or recharging their electronic devices. In addition, cables several meters long trail around the rooms, increasing the risk of accidents. The real problem lies in the need to completely renovate the heating system. The current strategy of replacing radiators gradually is proving ineffective: every time one radiator is replaced or repaired, another fails, making the situation unsustainable. Mrs. MP therefore asks the Minister what immediate measures will be taken to guarantee decent working and living conditions for students and staff at the Amiens school campus. She also wants to understand why, while costly work has been carried out, the issue of heating has not been addressed as a priority. Finally, she asks him about the actions planned to prevent such situations from arising. reproduce in the future. It is essential that the Amiens school campus does not become a symbol of the neglect of public high schools. While substantial subsidies are regularly granted to private establishments, it is legitimate to question the political will to preserve and improve public high schools in France. She wants to know his intentions on this matter.

Machine translation from French. The official text remains authoritative.

Timeline

  1. 4 February 2025

    Question

    Source: DateQuestion

  2. 28 October 2025

    Réponse

    Les sujets évoqués (températures des locaux anormalement basses, systèmes de chauffage défectueux, utilisation d'appareils de chauffage de substitution) relèvent des compétences de la collectivité de rattachement, propriétaire des locaux scolaires, et non pas du ministère de l'éducation nationale. Elle assure en effet, en tant que maître d'ouvrage, la construction, la reconstruction, l'extension et les grosses réparations, conformément à article L. 212-4 du code de l'éducation. Concernant la cité scolaire d'Amiens Sud, les chefs d'établissement signalent très régulièrement aux services de la région Hauts-de-France les dysfonctionnements constatés. Le service de prévention académique a enregistré, pour sa part, the whole ofs signalements portés sur les registres « santé et sécurité au travail ». Ces différents éléments ont été portés à la connaissance des autorités académiques ainsi qu'à la région. La question du confort thermique dégradé durant la période hivernale fait l'objet d'une attention particulière de la part de la région Hauts-de-France. Les températures anormalement basses constatées dans certains espaces en janvier 2025 ont conduit la région à prendre des mesures d'urgence et à engager des travaux de maintenance immédiats (désembouage du réseau, remplacement des radiateurs défectueux) en complément de travaux menés sur les trois dernières années. Pour répondre durablement à ces dysfonctionnements, la région a lancé une nouvelle phase d'études thermiques aimed at moderniser tout ou partie du réseau de chauffage interne pour mieux isoler les secteurs et faciliter les interventions de maintenance. Les travaux, estimés à plus de 5 millions d'euros, seront réalisés en plusieurs phases. La première est prévue pour la fin d'année scolaire 2025-2026. Les services de l'académie d'Amiens restent en contact régulier avec les services de la région sur ces problématiques de chauffage et l'avancement des travaux, afin de veiller à la préservation des conditions d'accueil et de travail pour the whole ofs élèves et des personnels de la cité scolaire d'Amiens.

    Source: DateReponse

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

No documents linked.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.