Summary
Secure High-voltage Infrastructure for Electricity from Lethal Damage Act or SHIELD Act - Amends the Federal Power Act to authorize the Federal Energy Regulatory Commission (FERC), with or without notice, hearing, or report, to order emergency measures to protect the reliability of either the bulk-power system or the defense critical electric infrastructure whenever the President issues a written directive or determination identifying an imminent grid security threat. Directs FERC to consult with governmental authorities in Canada, Mexico, and the Electric Reliability Organization (ERO) regarding implementation of emergency measures. Prescribes: (1) implementation procedures; and (2) related cost recovery measures affecting owners, operators, and users of either the bulk-power system or the defense critical electric infrastructure. Directs FERC to require any owner, user, or operator of the domestic bulk-power system to implement measures to protect the system against specified vulnerabilities. Requires FERC to issue an order directing ERO to submit for approval, within 30 days, a reliability standard requiring implementation, by any owner, operator, or user of the bulk-power system in the United States, of measures to protect the bulk-power system against an identified grid security vulnerability (including a protection plan with automated hardware-based solutions). Directs FERC also to order the ERO to submit reliability standards to: (1) protect the bulk-power system from a reasonably foreseeable geomagnetic storm event or electromagnetic pulse event (EMP); and (2) require entities that own or operate large transformers to ensure their adequate availability to restore promptly the reliable operation of the bulk-power system in the event of destruction or disability as a result of attack or a geomagnetic storm or EMP. Directs the Secretary of Energy to establish a program to: (1) develop technical expertise in the protection of electric energy systems against either geomagnetic storms or malicious acts using electronic communications or electromagnetic weapons; and (2) share it with owners, operators, or users of systems for the generation, transmission, or distribution of electric energy located in the United States and with state commissions.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 18 June 2013
Introduced in House (PDF)
Introduced in House · EN · 18 June 2013
Introduced in House
summary · EN · 18 June 2013
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/113th-congress/house-bill/2417
- Open data entity: https://api.congress.gov/v3/bill/113/hr/2417