United States · Bill · HR
H.R. 351 (114th)
LNG Permitting Certainty and Transparency Act
Introduced
14 January 2015
Last action
—
Status
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
LNG Permitting Certainty and Transparency Act Directs the Department of Energy (DOE), for proposals that must also obtain authorization from the Federal Energy Regulatory Commission or the United States Maritime Administration to site, construct, expand, or operate liquified natural gas (LNG) export facilities, to issue a decision on an application for authorization to export natural gas within 30 days after the later of: (1) the conclusion of the review to site, construct, expand, or operate the LNG facilities required by the National Environmental Policy Act of 1969 (NEPA); or (2) the date of enactment of this Act. Deems any NEPA review to be concluded: (1) 30 days after publication of a required Environmental Impact Statement if the project needs one; (2) 30 days after publication by DOE of a Finding of No Significant Impact if the project needs an Environmental Assessment; and (3) upon a determination by the lead agency that an application is eligible for a categorical exclusion pursuant to regulations under NEPA. (A "categorical exclusion" under NEPA is a category of actions which do not individually or cumulatively have a significant effect on the human environment and which have been found to have no such effect in procedures adopted by a federal agency in implementing environmental regulations and for which, therefore, neither an Environmental Assessment nor an Environmental Impact Statement is required.) Confers original and exclusive jurisdiction upon the U.S. Court of Appeals for the circuit in which the export facility under an application will be located over any civil action for the review of: (1) a DOE order regarding the application, or (2) DOE failure to issue a final decision on the application. Requires the Court, if it finds in a civil action that DOE has failed to issue a final decision on an application, to order DOE to issue one within 30 days. Requires the Court to set any civil action brought under this Act on the docket, for expedited consideration, as soon as practical after the filing date of the initial pleading. Amends the Natural Gas Act to set as a condition for approval of any authorization to export LNG that the DOE Secretary require the applicant to disclose publicly the specific destination or destinations of any such authorized LNG exports.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
8 official files
Referred in Senate (text)
Referred in Senate (text)
Referred in Senate · EN · 29 January 2015
Referred in Senate (PDF)
Referred in Senate · EN · 29 January 2015
Engrossed in House (text)
Engrossed in House · EN · 28 January 2015
Engrossed in House (PDF)
Engrossed in House · EN · 28 January 2015
Passed House without amendment
summary · EN · 28 January 2015
Introduced in House (text)
Introduced in House · EN · 14 January 2015
Introduced in House (PDF)
Introduced in House · EN · 14 January 2015
Introduced in House
summary · EN · 14 January 2015
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/114th-congress/house-bill/351
- Open data entity: https://api.congress.gov/v3/bill/114/hr/351