United States · Bill · HR
H.R. 5485 (96th)
A bill to provide for expedited installation of hydroelectric power generating facilities at the project for Replacement of Locks and Dam 26, Mississippi River, Alton, Illinois, and Missouri.
Introduced
28 September 1979
Last action
—
Status
Referred to House Committee on Public Works and Transportation.
Sponsors
—
Subjects
Discovery layer
Source updated
7 February 2024
Summary
Modifies the project for the replacement of locks and dam 26 on the Mississippi River in Illinois and Missouri to authorize the Secretary of the Army, through the Chief of Engineers, to install hydroelectric power generating facilities at such project. Requires congressional approval of such facility before appropriations will be made to construct such facility.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 28 September 1979
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/96th-congress/house-bill/5485
- Open data entity: https://api.congress.gov/v3/bill/96/hr/5485