PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 5485 (96th)

A bill to provide for expedited installation of hydroelectric power generating facilities at the project for Replacement of Locks and Dam 26, Mississippi River, Alton, Illinois, and Missouri.

referredUnited States· United States Congress· EN

Introduced

28 September 1979

Last action

Status

Referred to House Committee on Public Works and Transportation.

Sponsors

Subjects

Discovery layer

Source updated

7 February 2024

Summary

Modifies the project for the replacement of locks and dam 26 on the Mississippi River in Illinois and Missouri to authorize the Secretary of the Army, through the Chief of Engineers, to install hydroelectric power generating facilities at such project. Requires congressional approval of such facility before appropriations will be made to construct such facility.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.