United States · Bill · S
S. 1197 (94th)
Plutonium Recovery Control Act
Introduced
17 March 1975
Last action
—
Status
Referred to Joint Committee on Atomic Energy.
Sponsors
—
Subjects
Discovery layer
Source updated
2 September 2025
Summary
Plutonium Recovery Control Act - Prohibits the Nuclear Regulatory Commission from licensing, permitting, or otherwise authorizing, except for military or research and development purposes (1) the operation of any nuclear power reactor using recycled plutonium fuel, or (2) other construction or operation of any facility which reprocesses or recovers plutonium from spent nuclear power reactor fuel. Requires the Office of Technology Assessment to conduct and complete within three years a comprehensive study of the recycling of plutonium for the purpose of determining the extent of the dangers to the public health and safety and to the environment from such recycling. States that such study shall include: (1) investigation of the toxicity and carcinogenic characteristics of plutonium; (2) investigation of the risks of the unauthorized diversion or theft of plutonium; and (3) consideration of the development of systems for the use of plutonium which will assure the protection of the public health and safety and of the environment.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 17 March 1975
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/94th-congress/senate-bill/1197
- Open data entity: https://api.congress.gov/v3/bill/94/s/1197