United States · Bill · S
S. 1711 (97th)
A bill to authorize the Secretary of the Interior to engage in feasibility studies of various potential hydroelectric power projects, and to authorize the Muddy Creek Basin Erosion Control Project in Montana subject to a finding of economic, financial and environmental feasibility.
Introduced
7 October 1981
Last action
—
Status
Read second time and referred to Senate Committee on Energy and Natural Resources.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Directs the Secretary of the Interior to conduct feasibility studies of the Gibson Dam powerplant in Montana. Authorizes the Secretary to construct and operate surge relief with respect to the Muddy Creek Basin erosion control project in Montana upon a finding of financial feasibility and compliance with environmental law. Authorizes appropriations for construction, operation, and maintenance of such project.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 7 October 1981
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/97th-congress/senate-bill/1711
- Open data entity: https://api.congress.gov/v3/bill/97/s/1711