Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · S

S. 2461 (114th)

Nuclear Energy Innovation Capabilities Act

referredUnited States· United States Congress· EN

Introduced

21 January 2016

Last action

21 January 2016 · Introduced

Status

Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sen. Crapo, Mike [R-ID], Sen. Whitehouse, Sheldon [D-RI], Sen. Risch, James E. [R-ID], Sen. Booker, Cory A. [D-NJ], Sen. Hatch, Orrin G. [R-UT], Sen. Kirk, Mark Steven [R-IL]

Subjects

Nuclear energy, Energy, Budget

Source updated

24 March 2026

Nuclear energy · Energy · Budget

Summary

Nuclear Energy Innovation Capabilities Act This bill amends the Energy Policy Act of 2005 to revise the objectives for the civilian nuclear energy research and development programs of the Department of Energy (DOE). DOE shall carry out a specified program to enhance U.S. capabilities to develop new reactor technologies and related systems technologies through high-performance computation modeling and simulation techniques. DOE shall: (1) determine the mission need for a versatile reactor-based fast neutron source, which shall operate as a national user facility; and (2) submit a plan to Congress for establishment of such a facility. DOE may enter into a memorandum of understanding with the Nuclear Regulatory Commission (NRC) to establish a National Nuclear Innovation Center that: enables the testing and demonstration of reactor concepts to be proposed and funded by the private sector, establishes and operates a database to store and share data and knowledge on nuclear science between federal agencies and private industry, and establishes capabilities to develop and test reactor electric and nonelectric integration and energy conversion systems. DOE shall submit to Congress three alternative 10-year budget plans for civilian nuclear energy research and development. The NRC shall report to Congress on: the extent to which it is capable of licensing advanced reactor designs developed under this bill by the end of a specified four-year period, and any organizational or institutional barriers it will need to overcome to be able to license such designs.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 21 January 2016

    Introduced

    Read twice and referred to the Committee on Energy and Natural Resources.

    Source: IntroReferral

  2. 21 January 2016

    Introduced

    Introduced in Senate

    Source: IntroReferral

Votes

No vote records are attached yet.

Versions

Documents

3 official files

Introduced in Senate (text)

View fileDownload file

This file cannot be previewed here. Use View or Download.

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in Senate (text)

    Introduced in Senate · EN · 21 January 2016

    ViewDownloadOpen at official source

  • Introduced in Senate (PDF)

    Introduced in Senate · EN · 21 January 2016

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in Senate

    summary · EN · 21 January 2016

    Open at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.