Skip to content
PoliticalRepoPoliticalRepo

United States · Resolution · SCONRES

S.Con.Res. 124 (97th)

A concurrent resolution concerning the Administration's study of hydroelectric power.

referredUnited States· United States Congress· EN

Introduced

21 September 1982

Last action

21 September 1982 · Introduced

Status

Referred to the Committee on Environment and Public Works.

Sponsors

Sen. Sasser, Jim [D-TN], Sen. Baucus, Max [D-MT], Sen. Pressler, Larry [R-SD], Sen. Jepsen, Roger W. [R-IA], Sen. Grassley, Chuck [R-IA]

Subjects

Energy

Source updated

14 January 2025

Energy

Summary

Expresses the sense of the Congress that: (1) changes in the public power pricing practices should be the subject of extensive congressional deliberation; and (2) the current administration study of hydroelectric power policies of the Tennessee Valley Authority, other public power authorities, and Federal agencies shall be stopped until Congress has considered the subject.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 21 September 1982

    Introduced

    Referred to the Committee on Environment and Public Works.

    Source: IntroReferral

  2. 21 September 1982

    Introduced

    Introduced in Senate

    Source: IntroReferral

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.