556
Electricity Market Act Amendment Act
Introduced
16 December 2024
Last action
—
Status
AVALDATUD_RIIGITEATAJAS
Sponsors
—
Subjects
Discovery layer
Source updated
14 May 2025
Summary
In order to fulfill the renewable energy goals adopted by Estonia, it is necessary to develop and strengthen the Estonian electricity grid so that new wind and solar farms can be added to it. The bill changes the concept of the connection fee established in the Electricity Market Act in such a way that half of the connection costs of producers wishing to connect to the existing electricity network are covered by electricity consumers and the other half by those connecting to the network, and a separate fixed price list. The explanatory letter states that this enables potential producers and consumers to better forecast the costs associated with connecting to the electricity grid. In places where there is no existing electricity grid, the cost-based connection fee will still apply. Secondly, with the changes made in the draft, the scope of the development obligation for the main grid operator (Elering AS), but also for other electricity grid operators, is expanded, which allows above all, to make prudent and prudent investments in the main grid in order to meet the goal of 100% renewable electricity adopted by the Estonian state by 2030. Thirdly, in order to encourage optimal network use, the provisions related to the implementation of the network underutilization fee are specified with the proposed legal amendments, and in certain cases it is possible to change the previously requested electricity production technology if this is accompanied by a more efficient electricity network usage. As electricity prices fall with the growth of renewable electricity consumption, and investments strengthen the electricity grid and replace outdated lines, the changes will have a positive effect on electricity consumers.
Machine translation from Estonian. The official text remains authoritative.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
26 official files
Lõpptekst asice
Lõpptekst
docx · ET · 22 May 2025
Lõpptekst asice
asice · ET · 22 May 2025
Vabariigi Presidendi otsus
pdf · ET · 22 May 2025
Vabariigi Presidendi otsus asice
asice · ET · 22 May 2025
Vastuvõetud seadus asice
asice · ET · 15 May 2025
Kaaskiri Vabariigi Presidendile
pdf · ET · 15 May 2025
Vastuvõetud seadus
pdf · ET · 14 May 2025
Eelnõu
docx · ET · 12 May 2025
Seletuskiri
docx · ET · 5 May 2025
Muudatusettepanekute loetelu
docx · ET · 5 May 2025
Eelnõu
docx · ET · 5 May 2025
Seletuskirja lisa 2 (kooskõlastustabel)
docx · ET · 13 January 2025
Seletuskirja lisa 1 (rakendusakti kavand)
docx · ET · 13 January 2025
Seletuskiri
docx · ET · 13 January 2025
Eelnõu
docx · ET · 13 January 2025
EIS teade
txt · ET · 16 December 2024
Seletuskirja lisa 2 (kooskõlastustabel) pdf
pdf · ET · 16 December 2024
Seletuskirja lisa 1 (rakendusakti kavand) pdf
pdf · ET · 16 December 2024
Seletuskiri pdf
pdf · ET · 16 December 2024
Eelnõu pdf
pdf · ET · 16 December 2024
Seletuskirja lisa 2 (kooskõlastustabel) docx
docx · ET · 16 December 2024
Seletuskirja lisa 1 (rakendusakti kavand) docx
docx · ET · 16 December 2024
Seletuskiri docx
docx · ET · 16 December 2024
Eelnõu docx
docx · ET · 16 December 2024
Kaaskiri
pdf · ET · 16 December 2024
Algtekstid asice
asice · ET · 16 December 2024
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.