United States · Bill · HR
H.R. 878 (109th)
Electric Reliability Improvement Act of 2005
Introduced
17 February 2005
Last action
14 March 2005 · Referred
Status
Referred to the Subcommittee on Energy and Air Quality.
Sponsors
Rep. Dingell, John D. [D-MI-12], Sen. Markey, Edward J. [D-MA], Rep. Pallone, Frank [D-NJ-6], Rep. Rush, Bobby L. [D-IL-1], Rep. Towns, Edolphus [D-NY-10], Rep. Strickland, Ted [D-OH-6], Rep. Boucher, Rick [D-VA-9], Rep. Schakowsky, Janice D. [D-IL-9], Rep. Capps, Lois [D-CA-24], Rep. Inslee, Jay [D-WA-1], Rep. Waxman, Henry A. [D-CA-33], Sen. Baldwin, Tammy [D-WI], Rep. Engel, Eliot L. [D-NY-16], Rep. Wynn, Albert Russell [D-MD-4], Rep. Stupak, Bart [D-MI-1], Rep. Allen, Thomas H. [D-ME-1], Rep. Gordon, Bart [D-TN-6], Rep. Doyle, Michael F. [D-PA-14], Sen. Brown, Sherrod [D-OH], Rep. DeGette, Diana [D-CO-1], Rep. Solis, Hilda L. [D-CA-32], Rep. Kildee, Dale E. [D-MI-5], Rep. Davis, Jim [D-FL-11], Rep. Woolsey, Lynn C. [D-CA-6], Rep. Weiner, Anthony D. [D-NY-9], Rep. McGovern, James P. [D-MA-2]
Subjects
Energy
Source updated
15 August 2025
Summary
Electric Reliability Improvement Act of 2005 - Amends the Federal Power Act to grant the Federal Energy Regulatory Commission (FERC) jurisdiction over a FERC-certified Electric Reliability Organization (ERO), established under this Act to enforce, subject to FERC review, reliability standards for the bulk-power system. Includes within such jurisdiction regional entities and all users, owners, and operators of the bulk-power system for purposes of approving reliability standards and enforcing compliance with this Act. Urges the President to negotiate international agreements with the governments of Canada and Mexico to provide effective compliance with reliability standards and the effectiveness of the ERO in the United States, Canada, or Mexico. Restricts to the bulk-power system only the ERO authority to develop and enforce compliance with reliability standards. Declares that this Act does not authorize the ERO or FERC to order construction of additional generation or transmission capacity, or to set and enforce compliance with standards for adequacy or safety of electric facilities or services. Directs FERC to establish a regional advisory body on the petition of at least two-thirds of the States within a region that have more than one-half of their electric load served within the region. Authorizes such body to advise the ERO, a regional entity, or FERC. Declares this Act inapplicable to Alaska or Hawaii.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
17 February 2005
Introduced
Referred to the House Committee on Energy and Commerce.
Source: IntroReferral
17 February 2005
Introduced
Introduced in House
Source: IntroReferral
17 February 2005
Introduced
Introduced in House
Source: IntroReferral
14 March 2005
Referred
Referred to the Subcommittee on Energy and Air Quality.
Source: Committee
Votes
No vote records are attached yet.
Versions
- Introduced in House · 17 February 2005 · Download file
Documents
3 official files
Introduced in House (text)
This file cannot be previewed here. Use View or Download.
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in House (text)
Introduced in House · EN · 17 February 2005
Introduced in House (PDF)
Introduced in House · EN · 17 February 2005
ViewDownloadOpen at official source
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in House
summary · EN · 17 February 2005
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Sponsors
- Rep. Dingell, John D. [D-MI-12] · D · Sponsor
- Sen. Markey, Edward J. [D-MA] · D · Sponsor
- Rep. Pallone, Frank [D-NJ-6] · D · Sponsor
- Rep. Rush, Bobby L. [D-IL-1] · D · Sponsor
- Rep. Towns, Edolphus [D-NY-10] · D · Sponsor
- Rep. Strickland, Ted [D-OH-6] · D · Sponsor
- Rep. Boucher, Rick [D-VA-9] · D · Sponsor
- Rep. Schakowsky, Janice D. [D-IL-9] · D · Sponsor
- Rep. Capps, Lois [D-CA-24] · D · Sponsor
- Rep. Inslee, Jay [D-WA-1] · D · Sponsor
- Rep. Waxman, Henry A. [D-CA-33] · D · Sponsor
- Sen. Baldwin, Tammy [D-WI] · D · Sponsor
- Rep. Engel, Eliot L. [D-NY-16] · D · Sponsor
- Rep. Wynn, Albert Russell [D-MD-4] · D · Sponsor
- Rep. Stupak, Bart [D-MI-1] · D · Sponsor
- Rep. Allen, Thomas H. [D-ME-1] · D · Sponsor
- Rep. Gordon, Bart [D-TN-6] · D · Sponsor
- Rep. Doyle, Michael F. [D-PA-14] · D · Sponsor
- Sen. Brown, Sherrod [D-OH] · D · Sponsor
- Rep. DeGette, Diana [D-CO-1] · D · Sponsor
- Rep. Solis, Hilda L. [D-CA-32] · D · Sponsor
- Rep. Kildee, Dale E. [D-MI-5] · D · Cosponsor
- Rep. Davis, Jim [D-FL-11] · D · Cosponsor
- Rep. Woolsey, Lynn C. [D-CA-6] · D · Cosponsor
- Rep. Weiner, Anthony D. [D-NY-9] · D · Cosponsor
- Rep. McGovern, James P. [D-MA-2] · D · Cosponsor
- · hsif00 · Standing
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/109th-congress/house-bill/878
- Open data entity: https://api.congress.gov/v3/bill/109/hr/878
- us · 109-hr-878 · source updated 15 August 2025