Question· writtenPQ 225asked

310 Ms O. Mitchell asked the Minister for Transport the start and completion date for proposed joining of the Tallaght and Sandyford Luas lines in the city centre; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33354/05]

Ireland · Dáil Éireann · 9 November 2005

310 Ms O. Mitchell asked the Minister for Transport the start and completion date for proposed joining of the Tallaght and Sandyford Luas lines in the city centre; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33354/05]

Question· writtenPQ 224asked

302 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extention from Tallaght to Citywest; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33346/05]

Ireland · Dáil Éireann · 9 November 2005

302 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extention from Tallaght to Citywest; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33346/05]

Question· writtenPQ 223asked

301 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extension from Connolly to the docklands; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33345/05]

Ireland · Dáil Éireann · 9 November 2005

301 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extension from Connolly to the docklands; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33345/05]

Question· writtenPQ 222asked

299 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Sandyford Luas line extension to Cherrywood; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33343/05]

Ireland · Dáil Éireann · 9 November 2005

299 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Sandyford Luas line extension to Cherrywood; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33343/05]

Question· writtenPQ 221asked

297 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase one of metro west, from Tallaght to Clondalkin; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33341/05]

Ireland · Dáil Éireann · 9 November 2005

297 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase one of metro west, from Tallaght to Clondalkin; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33341/05]

Question· writtenPQ 220asked

293 Ms O. Mitchell asked the Minister for Transport the start and completion date for metro north; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33337/05]

Ireland · Dáil Éireann · 9 November 2005

293 Ms O. Mitchell asked the Minister for Transport the start and completion date for metro north; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33337/05]

Question· writtenPQ 219asked

291 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed metro west phase two, Clondalkin to Lucan; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33335/05]

Ireland · Dáil Éireann · 9 November 2005

291 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed metro west phase two, Clondalkin to Lucan; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33335/05]

Question· writtenPQ 218asked

283 Ms O. Mitchell asked the Minister for Transport the start and completion date for metro west phase 4, from Blanchardstown to Ballymun; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33327/05]

Ireland · Dáil Éireann · 9 November 2005

283 Ms O. Mitchell asked the Minister for Transport the start and completion date for metro west phase 4, from Blanchardstown to Ballymun; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33327/05]

Question· writtenPQ 217asked

282 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Lucan to city centre Luas; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33326/05]

Ireland · Dáil Éireann · 9 November 2005

282 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Lucan to city centre Luas; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33326/05]

Question· writtenPQ 216asked

281 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed metro west phase 3, Lucan to Blanchardstown; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33325/05]

Ireland · Dáil Éireann · 9 November 2005

281 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed metro west phase 3, Lucan to Blanchardstown; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33325/05]

Question· writtenPQ 215asked

280 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extension from the city centre to Liffey junction; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33324/05]

Ireland · Dáil Éireann · 9 November 2005

280 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Luas extension from the city centre to Liffey junction; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33324/05]

Question· writtenPQ 214asked

279 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Luas extension to Cherrywood and Bray; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33323/05]

Ireland · Dáil Éireann · 9 November 2005

279 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Luas extension to Cherrywood and Bray; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33323/05]

Question· writtenPQ 213asked

308 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Portlaoise train depot; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33352/05]

Ireland · Dáil Éireann · 9 November 2005

308 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Portlaoise train depot; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33352/05]

Question· writtenPQ 212asked

307 Ms O. Mitchell asked the Minister for Transport the start and completion date for a proposed Docklands rail station; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33351/05]

Ireland · Dáil Éireann · 9 November 2005

307 Ms O. Mitchell asked the Minister for Transport the start and completion date for a proposed Docklands rail station; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33351/05]

Question· writtenPQ 211asked

306 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase one of Navan rail link; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33350/05]

Ireland · Dáil Éireann · 9 November 2005

306 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase one of Navan rail link; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33350/05]

Question· writtenPQ 210asked

304 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Ennis-Athenry rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33348/05]

Ireland · Dáil Éireann · 9 November 2005

304 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Ennis-Athenry rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33348/05]

Question· writtenPQ 209asked

303 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Cork commuter rail service to Midleton; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33347/05]

Ireland · Dáil Éireann · 9 November 2005

303 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Cork commuter rail service to Midleton; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33347/05]

Question· writtenPQ 208asked

298 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Kildare rail upgrade; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33342/05]

Ireland · Dáil Éireann · 9 November 2005

298 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Kildare rail upgrade; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33342/05]

Question· writtenPQ 207asked

292 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Athenry to Tuam rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33336/05]

Ireland · Dáil Éireann · 9 November 2005

292 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Athenry to Tuam rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33336/05]

Question· writtenPQ 206asked

286 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed electrification of rail lines to Balbriggan, Maynooth, Navan and Hazelhatch; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33330/05]

Ireland · Dáil Éireann · 9 November 2005

286 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed electrification of rail lines to Balbriggan, Maynooth, Navan and Hazelhatch; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33330/05]

Question· writtenPQ 205asked

285 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed interconnector; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33329/05]

Ireland · Dáil Éireann · 9 November 2005

285 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed interconnector; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33329/05]

Question· writtenPQ 204asked

284 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Tuam to Claremorris rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33328/05]

Ireland · Dáil Éireann · 9 November 2005

284 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Tuam to Claremorris rail line; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33328/05]

Question· writtenPQ 203asked

278 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase two of the Navan rail link; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33322/05]

Ireland · Dáil Éireann · 9 November 2005

278 Ms O. Mitchell asked the Minister for Transport the start and completion date for phase two of the Navan rail link; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33322/05]

Question· writtenPQ 202asked

277 Mr. Durkan asked the Minister for Transport the cost to his or other Departments of the launch of Transport 21 including reports, consultancies, public relations work and the actual launch on 1 November 2005; and if he will make a statement on the matter. [33321/05]

Ireland · Dáil Éireann · 9 November 2005

277 Mr. Durkan asked the Minister for Transport the cost to his or other Departments of the launch of Transport 21 including reports, consultancies, public relations work and the actual launch on 1 November 2005; and if he will make a statement on the matter. [33321/05]

Question· writtenPQ 201asked

309 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed M50 upgrade phase one; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33353/05]

Ireland · Dáil Éireann · 9 November 2005

309 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed M50 upgrade phase one; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33353/05]

Question· writtenPQ 200asked

305 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed M3 motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33349/05]

Ireland · Dáil Éireann · 9 November 2005

305 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed M3 motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33349/05]

Question· writtenPQ 199asked

300 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Cork inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33344/05]

Ireland · Dáil Éireann · 9 November 2005

300 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Cork inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33344/05]

Question· writtenPQ 198asked

296 Ms O. Mitchell asked the Minister for Transport the start and completion date for Waterford city bypass; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33340/05]

Ireland · Dáil Éireann · 9 November 2005

296 Ms O. Mitchell asked the Minister for Transport the start and completion date for Waterford city bypass; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33340/05]

Question· writtenPQ 197asked

295 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Limerick Southern Ring Road; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33339/05]

Ireland · Dáil Éireann · 9 November 2005

295 Ms O. Mitchell asked the Minister for Transport the start and completion date for the proposed Limerick Southern Ring Road; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33339/05]

Question· writtenPQ 196asked

294 Ms O. Mitchell asked the Minister for Transport the start and completion date for Limerick Southern Ring Road; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33338/05]

Ireland · Dáil Éireann · 9 November 2005

294 Ms O. Mitchell asked the Minister for Transport the start and completion date for Limerick Southern Ring Road; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33338/05]

Question· writtenPQ 195asked

290 Ms O. Mitchell asked the Minister for Transport the start and completion date for the M50 upgrade phase two; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33334/05]

Ireland · Dáil Éireann · 9 November 2005

290 Ms O. Mitchell asked the Minister for Transport the start and completion date for the M50 upgrade phase two; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33334/05]

Question· writtenPQ 194asked

289 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Waterford inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33333/05]

Ireland · Dáil Éireann · 9 November 2005

289 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Waterford inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33333/05]

Question· writtenPQ 193asked

287 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Limerick inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33331/05]

Ireland · Dáil Éireann · 9 November 2005

287 Ms O. Mitchell asked the Minister for Transport the start and completion date for the Dublin-Limerick inter-urban motorway; if this project will be a public private partnership; the estimated cost of this project; and if he will make a statement on the matter. [33331/05]

Bill· HRH.R. 4280 (109th)referred

Transportation Revenue Ultimatum Enforcement ID Act of 2005

United States · United States Congress · 9 November 2005

Transportation Revenue Ultimatum Enforcement ID Act of 2005 - Prohibits a state from accepting as proof of personal identification or legal residence an individual's taxpayer identification number for purposes of issuing such individual a state-issued driver's license or personal identification card. Requires the Secretary of Transportation to: (1) withhold 100% of a state's apportionment for the National Highway System (NHS), the congestion mitigation and air quality improvement program, and the surface transportation program (STP) if the state fails to comply with such prohibition; and (2) transfer the equivalent amounts to the state's apportionment for incarceration of undocumented criminal aliens under the State Criminal Alien Assistance Program under the Immigration and National Act.

Question· Schriftliche Anfrage3596/Jschriftliche anfrage

Auftragsvergaben durch die ÖBB

Austria · National Council · 8 November 2005

Schriftliche Anfrage der Abgeordneten Dr. Günther Kräuter, Kolleginnen und Kollegen an den Bundesminister für Verkehr, Innovation und Technologie betreffend Auftragsvergaben durch die ÖBB <i>(an die Rechtsanwaltskanzlei des als Aufsichtsrat in der</i> <i>Gesellschaft der ÖBB fungierenden Dr. Dieter Böhmdorfer)</i>

Question· Schriftliche Anfrage3595/Jschriftliche anfrage

Eisenbahn-Hochleistungsstrecke im Raum Klagenfurt

Austria · National Council · 8 November 2005

Schriftliche Anfrage der Abgeordneten Mag. Melitta Trunk, Kolleginnen und Kollegen an den Bundesminister für Verkehr, Innovation und Technologie betreffend Eisenbahn-Hochleistungsstrecke im Raum Klagenfurt

Question· Schriftliche Anfrage3593/Jschriftliche anfrage

Wert von Versprechen

Austria · National Council · 8 November 2005

Schriftliche Anfrage der Abgeordneten Theresia Haidlmayr, Kolleginnen und Kollegen an den Bundesminister für Verkehr, Innovation und Technologie betreffend Wert von Versprechen <i>(barrierefreie Ausstattung des Bombardier-Zuges "Talent")</i>

Question· writtenPQ 502asked

591 Ms B. Moynihan-Cronin asked the Minister for Education and Science if her Department has received a submission for funding for the extension of a school bus service (details supplied) in County Kerry; if she will provide the necessary funding for this proposal; and if she will make a statement on the matter. [32540/05]

Ireland · Dáil Éireann · 8 November 2005

591 Ms B. Moynihan-Cronin asked the Minister for Education and Science if her Department has received a submission for funding for the extension of a school bus service (details supplied) in County Kerry; if she will provide the necessary funding for this proposal; and if she will make a statement on the matter. [32540/05]

Question· writtenPQ 377asked

464 Cecilia Keaveney asked the Minister for Transport the way in which the new ten-year plan will assist access from Dublin to County Donegal in the context of links to Letterkenny and Inishowen; and if he will make a statement on the matter. [33082/05]

Ireland · Dáil Éireann · 8 November 2005

464 Cecilia Keaveney asked the Minister for Transport the way in which the new ten-year plan will assist access from Dublin to County Donegal in the context of links to Letterkenny and Inishowen; and if he will make a statement on the matter. [33082/05]

Question· writtenPQ 376asked

463 Mr. Naughten asked the Minister for Transport the number of applications in each grade which have been received from public servants wishing to decentralise to the National Roads Authority in Ballinasloe; the number of positions at each grade required to facilitate the decentralisation; and if he will make a statement on the matter. [33038/05]

Ireland · Dáil Éireann · 8 November 2005

463 Mr. Naughten asked the Minister for Transport the number of applications in each grade which have been received from public servants wishing to decentralise to the National Roads Authority in Ballinasloe; the number of positions at each grade required to facilitate the decentralisation; and if he will make a statement on the matter. [33038/05]

Question· writtenPQ 375asked

462 Mr. Naughten asked the Minister for Transport the number of applications in each grade which have been received from civil servants wishing to decentralise to the Railway Safety Commission in Ballinasloe; the number of positions at each grade required to facilitate the decentralisation; and if he will make a statement on the matter. [33037/05]

Ireland · Dáil Éireann · 8 November 2005

462 Mr. Naughten asked the Minister for Transport the number of applications in each grade which have been received from civil servants wishing to decentralise to the Railway Safety Commission in Ballinasloe; the number of positions at each grade required to facilitate the decentralisation; and if he will make a statement on the matter. [33037/05]

Question· writtenPQ 374asked

461 Mr. J. Breen asked the Minister for Transport the number of persons with disabilities he has appointed to State boards under the aegis of his Department; and if he will make a statement on the matter. [33021/05]

Ireland · Dáil Éireann · 8 November 2005

461 Mr. J. Breen asked the Minister for Transport the number of persons with disabilities he has appointed to State boards under the aegis of his Department; and if he will make a statement on the matter. [33021/05]

Question· writtenPQ 373asked

460 Ms Shortall asked the Minister for Transport the costs incurred by or on behalf of his Department arising from the launch of the Transport 21 programme at Dublin Castle on 1 November 2005, including hire of venue and associated costs; cost of printing, videos, maps and graphics; if outside public relations companies or consultants were hired for the event; if so, the companies and the cost. [32998/05]

Ireland · Dáil Éireann · 8 November 2005

460 Ms Shortall asked the Minister for Transport the costs incurred by or on behalf of his Department arising from the launch of the Transport 21 programme at Dublin Castle on 1 November 2005, including hire of venue and associated costs; cost of printing, videos, maps and graphics; if outside public relations companies or consultants were hired for the event; if so, the companies and the cost. [32998/05]

Question· writtenPQ 372asked

459 Mr. Boyle asked the Minister for Transport if an indoor area of Shannon Airport has been set aside as a smoking area for the use of US army personnel; the reason such an exemption exists; and if Irish workers are involved in cleaning such an area. [32971/05]

Ireland · Dáil Éireann · 8 November 2005

459 Mr. Boyle asked the Minister for Transport if an indoor area of Shannon Airport has been set aside as a smoking area for the use of US army personnel; the reason such an exemption exists; and if Irish workers are involved in cleaning such an area. [32971/05]

Question· writtenPQ 371asked

458 Ms O. Mitchell asked the Minister for Transport if any of the consultancies involved in the drawing up of Transport 21 examined cross-Border road and rail linkages and the future needs of the Border and north-west region; and if he will make a statement on the matter. [32969/05]

Ireland · Dáil Éireann · 8 November 2005

458 Ms O. Mitchell asked the Minister for Transport if any of the consultancies involved in the drawing up of Transport 21 examined cross-Border road and rail linkages and the future needs of the Border and north-west region; and if he will make a statement on the matter. [32969/05]

Question· writtenPQ 370asked

457 Ms O. Mitchell asked the Minister for Transport the consideration which was given in the drawing up of the Transport 21 strategy to improving cross-Border road and rail links; the initiatives contained in the strategy to facilitate this; the start and completion dates for such projects; and if he will make a statement on the matter. [32968/05]

Ireland · Dáil Éireann · 8 November 2005

457 Ms O. Mitchell asked the Minister for Transport the consideration which was given in the drawing up of the Transport 21 strategy to improving cross-Border road and rail links; the initiatives contained in the strategy to facilitate this; the start and completion dates for such projects; and if he will make a statement on the matter. [32968/05]